Lakelandmarks Ask
Built in Lakeland by Summit Labs. See how this site is built.

South Village Commercial concept plan withdrawn at 3838 Harden Boulevard

A concept plan for South Village Commercial at 3838 Harden Blvd has been withdrawn.

Proposed Β· Latest recorded movement Nov 24, 2026

What happens next

The withdrawn status means this proposal is no longer active. If the project is to move forward, a new application would need to be submitted.

Where it is. On Harden Boulevard, about 750 feet from Glory Days Grill and about 900 feet from Azteca D' Oro. Distance measured from map data, October 2026.

Location sources and measurement

Two of the places within a quarter mile, nearest first; the nearest large store is kept when there is one. Straight-line distance between the mapped points. Restaurant locations geocoded from the Florida DBPR active food-service licence file, read Oct 15, 2026.

Timothy F Campbell submitted a concept plan for South Village Commercial at 3838 Harden Blvd in May 2026. The plan was withdrawn in November 2026.

Timeline

Receipts β€” verify every claim

These are the records this page is built from. None of them open directly right now β€” the agencies require a sign-in, offer only a search form, or publish the record inside a file to download.

Edition dated Nov 27, 2026 Β· receipt snapshots show when individual records were read.

Summaries are derived from public permit and agenda records and may contain errors β€” verify with the City of Lakeland before relying on them. Spotted a mistake? Tell us and we'll fix it fast.

Sources for this page: City of Lakeland planning applications.