Lakelandmarks Ask
Built in Lakeland by Summit Labs. See how this site is built.

Berakah Church planned on Holly Hill Grove Road in Davenport

A new church will be constructed on Holly Hill Grove Road in Davenport.

Permitted Β· Latest recorded movement Oct 28, 2025

What happens next

The project is working through inspection and surety requirements with Polk County.

Where it is. On Holly Hill Grove Road in Davenport.

Berakah Church is planning a new building at 2717 Holly Hill Grove Road in Davenport. The project has moved through the county's site-plan review process, with records showing a DRC-Non-Residential Site Plan filed in May 2025 currently requiring inspections, and a performance surety filing from October 2025 now requiring revisions.

Timeline

Apr 16, 2025
Site plan filed (DRC-Action)
Polk County LDDRC-2025-108
May 22, 2025
Non-residential site plan filed; inspections required
Polk County LDNON-2025-86
Oct 28, 2025
Performance surety filed; revisions required
Polk County LDSUR-2025-138

Receipts β€” verify every claim

Every claim above links to the record it came from.

Edition dated Nov 23, 2026 Β· receipt snapshots show when individual records were read.

Summaries are derived from public permit and agenda records and may contain errors β€” verify with Polk County before relying on them. Spotted a mistake? Tell us and we'll fix it fast.

Sources for this page: Polk County permit records.