First Presbyterian Church renovations underway at Lake Hollingsworth
The church at 175 Lake Hollingsworth Drive has pulled permits for a Scout building project and an interior renovation.
Under Construction · Latest recorded movement Sep 24, 2026
Where it is. On Lake Hollingsworth Drive.
First Presbyterian Church of Lakeland has been working through a series of building permits at its 175 Lake Hollingsworth Drive campus. In late 2025 it finished a roughly $300,000 project the permit records simply label the "Scout Building," involving building, electrical, mechanical, plumbing and roofing contractors.
A second, larger interior renovation valued at about $500,000 was issued in March 2026 and is now in progress. Earlier, in mid-2025, the church replaced a small air-conditioning system. The records don't spell out exactly what the finished spaces will be used for.
The address also hosts several community events each year, including the Power In Pink 5K, Bridge Builder 5K, Crop Hunger Walk and Ride of Silence, permitted through the city's special-event process.
Timeline
Receipts — verify every claim
These are the records this page is built from. None of them open directly right now — the agencies require a sign-in, offer only a search form, or publish the record inside a file to download.
Status: Finaled · Filed 2025-11-06 · Issued 2025-12-09 · Finaled 2026-03-10 · Source snapshot read Nov 22, 2026
ims.lakelandgov.net · City of Lakeland sign-in required Permit BLD26-00261 — Interior Renovation
Status: Finaled · Filed 2026-01-14 · Issued 2026-03-05 · Finaled 2026-09-24 · Source snapshot read Nov 21, 2026
ims.lakelandgov.net · City of Lakeland sign-in required Permit BLD25-05436 — Mechanical replacement
Status: Finaled · Filed 2025-07-09 · Issued 2025-07-10 · Finaled 2025-07-16 · Source snapshot read Nov 24, 2026
ims.lakelandgov.net · City of Lakeland sign-in required