Lakelandmarks Ask
Built in Lakeland by Summit Labs. See how this site is built.

LRH endoscopy-building site plan approved September 17

The Endo Building site plan at 1330 Lakeland Hills Boulevard was approved September 17, 2026. Construction and an opening date are not established by that approval.

Approved · Latest recorded movement Sep 17, 2026

What happens next

The Endo Building site plan is Approved. A project-specific building permit or an operator update would establish the next construction milestone.

Where it is. On Lakeland Hills Boulevard, about 500 feet from Watson Clinic Restaurant. Distance measured from map data, October 2026.

Location sources and measurement

The one named place within a quarter mile in the map data we hold. Straight-line distance between the mapped points. Restaurant locations geocoded from the Florida DBPR active food-service licence file, read Oct 15, 2026.

Lakeland Regional Health’s Endo Building site plan, SIT26-005, was approved September 17, 2026, according to a November 12 portal recheck.

The original PUD modification and minor modification PUD26-015 are also Approved in the held records. Those planning approvals do not establish a construction permit, a building start or an opening date.

Imaging and other renovations inside the existing hospital at 1324 Lakeland Hills Boulevard are a separate work scope with their own permits. Their completed work does not establish construction progress on this new building.

Timeline

Mar 17
City approved a modification to Lakeland Regional Health's Planned Unit Development
Lakeland approvals PUD26-003 · City of Lakeland sign-in required
Apr 29
Site plan for the Lakeland Regional Health Endo Building entered city review
Lakeland approvals SIT26-005 · City of Lakeland sign-in required
Sep 17
Endo Building site plan approved; confirmed by a November 12 portal recheck
Lakeland site plan SIT26-005 · City of Lakeland sign-in required

Receipts — verify every claim

These are the records this page is built from. None of them open directly right now — the agencies require a sign-in, offer only a search form, or publish the record inside a file to download.

Edition dated Nov 27, 2026 · receipt snapshots show when individual records were read.

Summaries are derived from public permit and agenda records and may contain errors — verify with the City of Lakeland before relying on them. Spotted a mistake? Tell us and we'll fix it fast.

Sources for this page: City of Lakeland planning applications.