Lakelandmarks
Built by Summit Labs — enterprise-grade systems, automation & technology leadership, at small‑business scale. Built by Summit Labs See what we do
Lakeland Winter Haven Auburndale Bartow Haines City Davenport Lake Wales Mulberry Polk City Fort Meade Frostproof I-4 US-27
Under Construction Civic & Health

Lone Palm Golf Club is renovating its clubhouse and reworking the course

The 338-acre Lone Palm Golf Club off Lone Palm Drive is remodeling its clubhouse and seeking city approval for a course renovation master plan.

Lone Palm Golf Club LLC is overhauling its longtime golf course and clubhouse on roughly 338 acres south of W. Memorial Boulevard, east and west of Lone Palm Drive, and west of Howard Avenue. The city has been processing a package of approvals filed by Jason W. Rice of LP Engineering Services, including a completed concept plan, a site plan still under review, and a conditional use permit meant to recognize the existing golf course as a conforming use and allow new recreational facilities.

Work on the clubhouse at 800 Lone Palm Drive is already moving. Records show a finaled entry canopy addition and a finaled third-floor renovation, along with an issued demolition permit for exploratory work in the kitchen and men's locker room, plus several fire-protection permits. Two monument-sign permits for the "Lone Palm" name were filed but later withdrawn.

The conditional use permit (CUP26-008) went before the Planning and Zoning Board on September 15, 2026 for a public hearing and final decision. The records provided do not state the board's outcome.

What happens next

The site plan (SIT26-035) remains under review, and the outcome of the September 15, 2026 P&Z hearing on the conditional use permit is not stated in these records. Clubhouse building permits continue to move through inspection.

Timeline

Aug 14, 2025
Entry canopy addition permit issued for the clubhouse ($75,000); later finaled
Permit BLD25-05659 · City of Lakeland sign-in required
Aug 26, 2025
Third-floor clubhouse renovation permit issued ($376,000); later finaled
Permit BLD25-06289 · City of Lakeland sign-in required
May 27
Demolition permit issued for exploratory work in kitchen and men's locker room
Permit BLD26-03111 · City of Lakeland sign-in required
Aug 3
Conditional use permit for the renovation master plan filed
P&Z Packet CUP26-008
Sep 2
Fire suppression system permit issued for the clubhouse
Permit LFD26-00207 · City of Lakeland sign-in required
Sep 15
Conditional use permit scheduled for P&Z public hearing and final decision
P&Z Packet CUP26-008

Receipts — verify every claim

1 of 6 open straight to the record. The rest need a sign-in at the agency, or a search on its portal.

Spotted by the Lakelandmarks records pipeline · records checked Sep 24, 2026

Summaries are derived from public permit and agenda records and may contain errors — verify with the City of Lakeland before relying on them. Spotted a mistake? Tell us and we'll fix it fast.

Sources for this page: City of Lakeland planning applications · City of Lakeland permit records · City of Lakeland P&Z Board agendas.