Lakelandmarks Ask
Built in Lakeland by Summit Labs. See how this site is built.
Highland City

Sackett Office Building coming to Highway 98 in Highland City

A 6,000-square-foot office building is planned on Highway 98 in Highland City.

In Review Β· Latest recorded movement Jun 20, 2025

What happens next

The project is undergoing county inspections. Once those are complete and any deficiencies addressed, the site plan would move toward approval.

Where it is. On SE 5th Street in Highland City, about 550 feet from Highland City Culvers and about 650 feet from McDonald's. Distance measured from map data, October 2026.

Location sources and measurement

Two of the places within a quarter mile, nearest first; the nearest large store is kept when there is one. Straight-line distance between the mapped points. Restaurant locations geocoded from the Florida DBPR active food-service licence file, read Oct 15, 2026.

Sackett Office is pursuing site-plan approval for a new 6,000-square-foot office building on SE 5th Street (Highway 98) in Highland City. The project includes paved parking and a dry retention pond designed to manage stormwater from a 100-year storm event with no discharge offsite, treating runoff within 36 hours.

The site plan was filed with Polk County in June 2025 and is currently in inspections.

Timeline

Jun 20, 2025
Site plan filed with Polk County
Polk County Accela

Receipts β€” verify every claim

Every claim above links to the record it came from.

Edition dated Nov 23, 2026 Β· receipt snapshots show when individual records were read.

Summaries are derived from public permit and agenda records and may contain errors β€” verify with Polk County before relying on them. Spotted a mistake? Tell us and we'll fix it fast.

Sources for this page: Polk County permit records.