Lakelandmarks
Built by Summit Labs β€” enterprise-grade systems, automation & technology leadership, at small‑business scale. Built by Summit Labs See what we do
Lakeland Winter Haven Auburndale Bartow Haines City Davenport Lake Wales Mulberry Polk City Fort Meade Frostproof I-4 US-27
Under Construction Roads

A new bike trail is planned along SR 563 near Lake Hunter

FDOT has a bike path/trail project along SR 563 between the Lake Hunter Boat Ramp and Lime Street in Lakeland.

The Florida Department of Transportation has a bike path/trail project on SR 563 running from the Lake Hunter Boat Ramp to Lime Street in Lakeland. The work program lists it as a bike path/trail for fiscal year 2028, covering a stretch of roughly 548 meters (about a third of a mile).

The project's construction phase is logged as "pre-construction underway," meaning the groundwork phase has started. Cost figures, design details, and a public opening date are not yet public in these records.

A separate state environmental permit tied to this location β€” for SR 37 (South Florida Avenue) from Ariana Street to Lime Street β€” was filed in June 2026 and later denied. That permit is for a different road and its connection to the SR 563 trail is not certain.

What happens next

The FDOT item is programmed for fiscal year 2028. Watch for design plans and a construction schedule as that year approaches.

Timeline

Jun 26
Environmental permit filed for SR 37 road project from Ariana St. to Lime St. (later denied)
SWFWMD ERP 49354 (943935) Β· District viewer is offline

Receipts β€” verify every claim

1 of 2 open straight to the record. The rest need a sign-in at the agency, or a search on its portal.

Spotted by the Lakelandmarks records pipeline Β· records checked Oct 9, 2026

Summaries are derived from public permit and agenda records and may contain errors β€” verify with FDOT or SWFWMD before relying on them. Spotted a mistake? Tell us and we'll fix it fast.

Sources for this page: FDOT work program Β· SWFWMD environmental permits.