Lakelandmarks Ask
Built in Lakeland by Summit Labs. See how this site is built.

SR 60 will be elevated over CSX Railroad tracks

FDOT is planning a grade separation project where State Road 60 will cross CSX Railroad tracks at a different elevation.

In Review · No dated movement confirmed

What happens next

Right-of-way acquisition will proceed during 2026 and 2027. Construction is expected to begin in 2027 or 2028 pending completion of property acquisition and detailed design.

The Florida Department of Transportation has added a rail capacity project to its Five-Year Work Program: elevating SR 60 to pass over CSX Railroad tracks instead of at the same level. This type of work—called a grade separation—reduces conflicts between vehicle and rail traffic.

The project is currently in the right-of-way (ROW) acquisition phase, meaning FDOT is working to secure the land needed for construction. Fiscal funding is planned for 2027 and 2028.

Timeline

Receipts — verify every claim

Every claim above links to the record it came from.

Edition dated Nov 27, 2026 · receipt snapshots show when individual records were read.

Summaries are derived from public permit and agenda records and may contain errors — verify with FDOT before relying on them. Spotted a mistake? Tell us and we'll fix it fast.

Sources for this page: FDOT work program.