Lakelandmarks
Built by Summit Labs β€” enterprise-grade systems, automation & technology leadership, at small‑business scale. Built by Summit Labs See what we do
Lakeland Winter Haven Auburndale Bartow Haines City Davenport Lake Wales Mulberry Polk City Fort Meade Frostproof I-4 US-27
Permitted Civic & Health
Lakeland Hills

Transit stop bench installed at Lakeland Hills Boulevard

A bus shelter bench has been permitted and finalized at 4255 Lakeland Hills Boulevard.

The City of Lakeland permitted construction of a transit stop bench at 4255 Lakeland Hills Boulevard. The permit was issued in January 2026 and finalized in March 2026, with a project valuation of $3,000.

What happens next

The bench has already been finalized as of March 2026.

Timeline

Oct 28, 2025
Permit filed
Lakeland IMS BLD25-08236
Jan 28
Permit issued
Lakeland IMS BLD25-08236
Mar 4
Permit finalized
Lakeland IMS BLD25-08236

Receipts β€” verify every claim

These are the records this page is built from. The agencies now require a sign-in to open them directly.

Spotted by the Lakelandmarks records pipeline Β· records checked Aug 27, 2026

Summaries are derived from public permit and agenda records and may contain errors β€” verify with the City of Lakeland or Polk County before relying on them. Spotted a mistake? Tell us and we'll fix it fast.

Sources for this page: City of Lakeland permit records.