Lakelandmarks Ask
Built in Lakeland by Summit Labs. See how this site is built.
Lakeland Winter Haven Auburndale Bartow Haines City Davenport Lake Wales Mulberry Polk City Fort Meade Frostproof I-4 US-27
Complete Industrial

Three industrial buildings coming to County Line Road

Where it is. On County Line Road in south Lakeland.

Three industrial buildings with parking and stormwater infrastructure are planned for County Line Road near Lakeland.

Trimak is developing three industrial buildings on County Line Road in Lakeland, along with associated parking, utility, and stormwater infrastructure. The project includes two driveway connections to County Line Road.

The site plan has been approved and a Type V intersection has been designed to serve the development. Performance surety for the project was released, indicating that required infrastructure improvements have been completed or secured.

What happens next

Construction appears to have finished and performance bonds have been released.

Timeline

Nov 27, 2024
Site plan filed for three industrial buildings with parking and stormwater infrastructure
Polk County Site Plan LDNON-2024-155
Apr 11, 2025
Performance surety filed
Polk County Surety LDSUR-2025-50
May 9, 2025
Type V intersection and driveway improvements filed
Polk County Right-of-Way LDROW-2025-32

Receipts β€” verify every claim

Every claim above links to the record it came from.

Spotted by the Lakelandmarks records pipeline Β· records checked Nov 3, 2026

Summaries are derived from public permit and agenda records and may contain errors β€” verify with Polk County before relying on them. Spotted a mistake? Tell us and we'll fix it fast.

Sources for this page: Polk County permit records.