Lakelandmarks
Built by Summit Labs β€” enterprise-grade systems, automation & technology leadership, at small‑business scale. Built by Summit Labs See what we do
Lakeland Winter Haven Auburndale Bartow Haines City Davenport Lake Wales Mulberry Polk City Fort Meade Frostproof I-4 US-27
Permitted Civic & Health

The Way Community Church removes wall at Commerce Point location

Where it is. On Commerce Point Drive.

A permitted remodel project at the church's Commerce Point Drive building.

The Way Community Church has received a building permit to remove an existing wall at its facility located at 2290 Commerce Point Drive in Lakeland. The work is valued at $10,000 and involves interior alterations.

The permit was issued in June 2026 and is classified as a remodel/alteration project. Sackett's Construction Services is listed as the building contractor, with Deal Electric and Phoenix Heating Cooling handling electrical and mechanical work.

What happens next

Work may proceed under the issued permit. Inspections will be required as the project progresses.

Timeline

Receipts β€” verify every claim

These are the records this page is built from. None of them open directly right now β€” the agencies require a sign-in, offer only a search form, or publish the record inside a file to download.

Spotted by the Lakelandmarks records pipeline Β· records checked Oct 9, 2026

Lakelandmarks is not affiliated with The Way Community Church Inc; this page is built from public records about the project.

Summaries are derived from public permit and agenda records and may contain errors β€” verify with the City of Lakeland before relying on them. Spotted a mistake? Tell us and we'll fix it fast.

Sources for this page: City of Lakeland permit records.