Communications tower gets upgraded at Lakeland airport
MGM Corporation of Lakeland is modifying a communications tower at 3604 Ventura Drive East with roof work, a backup generator, and electrical upgrades.
Permitted ยท Latest recorded movement Oct 27, 2026
Where it is. On Ventura Drive East in the Airport area.
A communications tower at 3604 Ventura Drive East is undergoing modifications. The work includes a roof replacement, installation of a 30-kilowatt diesel generator, and electrical system upgrades. Permits were issued between February and May 2026, with one roof permit already finalized.
Timeline
Receipts โ verify every claim
These are the records this page is built from. None of them open directly right now โ the agencies require a sign-in, offer only a search form, or publish the record inside a file to download.
Status: Finaled ยท Filed 2025-11-18 ยท Issued 2025-12-09 ยท Finaled 2026-07-24 ยท Source snapshot read Nov 22, 2026
ims.lakelandgov.net ยท City of Lakeland sign-in required Airport Remodel Permit BLD26-00880
Status: Finaled ยท Filed 2026-02-12 ยท Issued 2026-05-05 ยท Finaled 2026-10-27 ยท Source snapshot read Nov 26, 2026
ims.lakelandgov.net ยท City of Lakeland sign-in required Generator Installation Permit BLD26-00892
Status: Finaled ยท Filed 2026-02-13 ยท Issued 2026-05-05 ยท Finaled 2026-10-07 ยท Source snapshot read Nov 26, 2026
ims.lakelandgov.net ยท City of Lakeland sign-in required Roof Replacement Permit BLD26-00903
Status: Finaled ยท Filed 2026-02-13 ยท Issued 2026-02-19 ยท Finaled 2026-03-23 ยท Source snapshot read Nov 21, 2026
ims.lakelandgov.net ยท City of Lakeland sign-in required