Lakelandmarks Ask
Built in Lakeland by Summit Labs. See how this site is built.

Deer Run Plaza retail complex proposed on US 17-92 in Davenport

A three-building retail complex is proposed for 4.19 acres on North Highway 17-92 in Davenport.

In Review Β· Latest recorded movement Jun 20, 2025

What happens next

The developer will address county staff comments and resubmit the site plan for approval.

Where it is. On US 17-92 in Davenport.

Deer Run Plaza would bring three retail buildings to a 4.19-acre site on North Highway 17-92 in Davenport. The site plan includes a wet pond for stormwater that will discharge to an adjacent ditch.

The project is currently under review by Polk County. The site plan was filed in June 2025 and requires revisions before it can move forward.

Timeline

Jun 20, 2025
Site plan filed with Polk County; revisions required
Polk County Accela LDNON-2025-85

Receipts β€” verify every claim

Every claim above links to the record it came from.

Edition dated Nov 23, 2026 Β· receipt snapshots show when individual records were read.

Summaries are derived from public permit and agenda records and may contain errors β€” verify with Polk County before relying on them. Spotted a mistake? Tell us and we'll fix it fast.

Sources for this page: Polk County permit records.