Lakelandmarks
Built by Summit Labs β€” enterprise-grade systems, automation & technology leadership, at small‑business scale. Built by Summit Labs See what we do
Lakeland Winter Haven Auburndale Bartow Haines City Davenport Lake Wales Mulberry Polk City Fort Meade Frostproof I-4 US-27
Under Construction Commercial
Clermont

Phase 2 inspections underway for mixed-use project at US 192 and Town Center Boulevard

The second phase of a mixed-use development at US Highway 192 and Town Center Boulevard in Clermont is in inspections.

A mixed-use project at the corner of US Highway 192 and Town Center Boulevard in Clermont has moved into Phase 2, which is focused on inspections. The development is located at 9420 Highway 192.

The project is currently at the inspections stage, meaning construction-related inspections are required before the development can proceed further.

What happens next

Phase 2 inspections must be completed and approved.

Timeline

Sep 8, 2024
Phase 2 inspection filing submitted
Polk County Accela

Receipts β€” verify every claim

Every claim above links to the record it came from.

Spotted by the Lakelandmarks records pipeline Β· records checked Sep 24, 2026

Summaries are derived from public permit and agenda records and may contain errors β€” verify with Polk County before relying on them. Spotted a mistake? Tell us and we'll fix it fast.

Sources for this page: Polk County permit records.