Lakelandmarks
Built by Summit Labs β€” enterprise-grade systems, automation & technology leadership, at small‑business scale. Built by Summit Labs See what we do
Lakeland Winter Haven Auburndale Bartow Haines City Davenport Lake Wales Mulberry Polk City Fort Meade Frostproof I-4 US-27
Approved Roads
North Lakeland

New bridge planned for Grandview Parkway between Posner Boulevard and Dunson Road

Florida Department of Transportation plans to build a new bridge on Grandview Parkway north of Posner Boulevard.

The Florida Department of Transportation has included a new bridge project on Grandview Parkway in its Five-Year Work Program. The bridge will span the area between north of Posner Boulevard and Dunson Road.

The project is currently in the adopted-but-not-yet-begun phase, with construction scheduled across fiscal years 2027 through 2030.

What happens next

This project is included in FDOT's official work program but has not yet begun. Actual construction start and detailed design plans are not yet public.

Timeline

Jul 9
Project adopted in FDOT Five-Year Work Program; construction phase scheduled for fiscal years 2027–2030
FDOT Work Program Item 451381

Receipts β€” verify every claim

Every claim above links to the record it came from.

Spotted by the Lakelandmarks records pipeline Β· records checked Aug 27, 2026

Summaries are derived from public permit and agenda records and may contain errors β€” verify with the City of Lakeland or Polk County before relying on them. Spotted a mistake? Tell us and we'll fix it fast.

Sources for this page: FDOT work program.